EasyManua.ls Logo

Fujitsu PRIMERGY RX100 S7 - Replacing the Power Cables (Redundant PS); Concluding Steps; Required Tools; Preliminary Steps

Fujitsu PRIMERGY RX100 S7
490 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
440 Upgrade and Maintenance Manual
RX100 S7
Cables
16.11.7 Concluding steps
Ê Perform the following procedures:
1. "Closing the server" on page 66
2. "Installing the server in the rack" on page 68
3. "Switching on the server" on page 72
4. "Closing the rack door" on page 73
16.12 Replacing the power cables (redundant PS)
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 43.
16.12.1 Required tools
Preliminary and concluding steps: tool-less
Main steps: tool-less
16.12.2 Preliminary steps
Ê Perform the following procedures:
1. "Opening the rack door" on page 59
2. "Locating the defective server" on page 55
3. "Shutting down the server" on page 59
4. "Extending/removing the server from the rack" on page 60
Field Replaceable Units (FRU)
Average task duration: 5 minutes

Table of Contents

Other manuals for Fujitsu PRIMERGY RX100 S7

Related product manuals