340 Upgrade and Maintenance Manual
RX100 S7
Management and diagnostics modules
14.3.3 Replacing the front VGA/LAN module
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 43.
14.3.3.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
14.3.3.2 Preliminary steps
Ê Perform the following procedures:
1. "Opening the rack door" on page 59
2. "Locating the defective server" on page 55
3. "Disabling BitLocker functionality" on page 75
4. "Shutting down the server" on page 59
5. "Extending/removing the server from the rack" on page 60
6. "Opening the server" on page 64
14.3.3.3 Removing the riser module 1
Ê Remove the riser module 1 as described in section "Removing the riser
module 1" on page 336.
14.3.3.4 Removing the front LAN card
Ê Remove the front LAN card as described in section "Removing the front LAN
card" on page 336.
Field Replaceable Units (FRU)
Average task duration: 5 minutes