328 Upgrade and Maintenance Manual
RX100 S7
Management and diagnostics modules
14.3 Front VGA/LAN module
14.3.1 Installing the front VGA/LAN module
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 43.
14.3.1.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
14.3.1.2 Preliminary steps
Ê Perform the following procedures:
1. "Opening the rack door" on page 59
2. "Disabling BitLocker functionality" on page 75
3. "Shutting down the server" on page 59
4. "Extending/removing the server from the rack" on page 60
5. "Opening the server" on page 64
Upgrade and Repair Units (URU)
Average task duration: 5 minutes