RX100 S7
Upgrade and Maintenance Manual 167
Hard disk drives / solid state drives
7.2.4.5 Concluding steps
Ê Perform the following procedures:
1. "Closing the rack door" on page 73
2. "Performing a RAID array rebuild" on page 95
7.2.5 Replacing the 3.5-inch SAS/SATA backplane
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 43.
7.2.5.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
7.2.5.2 Preliminary steps
Ê Perform the following procedures:
1. "Opening the rack door" on page 59
2. "Locating the defective server" on page 55
3. "Shutting down the server" on page 59
4. "Extending/removing the server from the rack" on page 60
5. "Opening the server" on page 64
Field Replaceable Units (FRU)
Average task duration: 10 minutes