RX100 S7
Upgrade and Maintenance Manual 399
Cables
16.3.5 Concluding steps
Ê Perform the following procedures:
1. "Closing the server" on page 66
2. "Installing the server in the rack" on page 68
3. "Switching on the server" on page 72
4. "Closing the rack door" on page 73
16.4 Replacing the SATA cable for the ODD
V CAUTION!
Follow the safety instructions in chapter "Important information" on 
page 43.
16.4.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
Upgrade and Repair Units (URU)
Average task duration: 5 minutes