274 Upgrade and Maintenance Manual
RX100 S7
Main memory
10.2.5 Concluding steps
Ê Perform the following procedures:
1. "Closing the server" on page 66
2. "Installing the server in the rack" on page 68
3. "Updating the system board BIOS and iRMC" on page 81
4. "Enabling SVOM boot watchdog functionality" on page 89
5. "Switching on the server" on page 72
6. "Enabling BitLocker functionality" on page 94
7. "Closing the rack door" on page 73
10.3 Removing a memory module
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 43.
10.3.1 Required tools
●
Preliminary and concluding steps: tool-less
●
Main steps: tool-less
Upgrade and Repair Units (URU)
Average task duration: 5 minutes