EasyManua.ls Logo

Fujitsu PRIMERGY RX100 S7 - Replacing the BBU; Preliminary Steps; Required Tools

Fujitsu PRIMERGY RX100 S7
490 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RX100 S7
Upgrade and Maintenance Manual 257
Expansion cards and backup units
9.5.5 Replacing the BBU
V CAUTION!
Do not connect the cable using excessive force, the connector is
weak.
Dispose of used battery properly. Keep away from children.
Do not throw battery backup units into the trash can. Batteries must
be disposed of in accordance with local regulations concerning
special waste.
Follow the safety instructions in chapter "Important information" on
page 43.
9.5.5.1 Required tools
Preliminary and concluding steps: tool-less
Main steps: tool-less
9.5.5.2 Preliminary steps
Ê Perform the following procedures:
1. "Opening the rack door" on page 59
2. "Disabling SVOM boot watchdog functionality" on page 76
3. "Shutting down the server" on page 59
4. "Extending/removing the server from the rack" on page 60
5. "Opening the server" on page 64
Upgrade and Repair Units (URU)
Average task duration: 15 minutes

Table of Contents

Other manuals for Fujitsu PRIMERGY RX100 S7

Related product manuals