130 Upgrade and Maintenance Manual
RX100 S7
Power supply
6.3.3 Replacing the power distribution board
V CAUTION!
Follow the safety instructions in chapter "Important information" on
page 43.
I The power distribution board is mounted on the PSU cage. You must
remove the PSU cage to get access to the power distribution board.
6.3.3.1 Required tools
Preliminary and concluding steps: tool-less
Main steps: Phillips PH2 / (+) No. 2 screw driver
6.3.3.2 Preliminary steps
Ê Perform the following procedures:
1. "Opening the rack door" on page 59
2. "Locating the defective server" on page 55
3. "Disabling BitLocker functionality" on page 75
4. "Shutting down the server" on page 59
5. "Extending/removing the server from the rack" on page 60
6. "Opening the server" on page 64
Field Replaceable Units (FRU)
Average task duration: 15 minutes