EasyManua.ls Logo

Agilent Technologies E5071C - Page 2682

Agilent Technologies E5071C
2685 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Controlling Multiport Test Set
2909
second.
3. Execute a sweep for the second channel.
4. Set the connections of the test ports and the output of the
control line according to the setting of the channel swept
last.
5. Execute a sweep for the last channel.
Stop or trigger
wait
The setting is not switched for the stop state; it is switched for the
trigger wait state.

Table of Contents

Other manuals for Agilent Technologies E5071C

Related product manuals