EasyManuals Logo

ISHIDA CCW-R-2 B Series User Manual

ISHIDA CCW-R-2 B Series
492 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #311 background imageLoading...
Page #311 background image
CCW-R-2**B INSTRUCTION MANUAL 9 CLEANUP PROCEDURES
9-1
9 CLEANUP PROCEDURES
9.1 Summary
This chapter describes cleaning procedures for each component.
Clean the components properly, depending on weighed product types and dirt conditions.
Before cleaning, drain any weighed products remaining in the device.
( 6.8 [Drain] Screen)
• When cleaning each component, the operator must turn OFF and lock the
main power switch, and keep the key in his possession during the work.
<Contents>
• Cleaning procedures and cycle of the components
<Purpose>
To understand installation, removal, and cleaning procedures of the components in order to prevent
foreign matter from entering the product and to maintain the hygiene of the device.
<Intended reader>
• Operators
• Maintenance engineers

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ISHIDA CCW-R-2 B Series and is the answer not in the manual?

ISHIDA CCW-R-2 B Series Specifications

General IconGeneral
BrandISHIDA
ModelCCW-R-2 B Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals