4 OPERATION PROCEDURES CCW-R-2**
ï¼¢
INSTRUCTION MANUAL
4-6
4.4.3 Turning the Device Power Switch ON
• Turn the main power switch ON at least 30 minutes before starting the
production in order to get stable weighing results.
This section describes how to supply power to the device.
4.4.4 Turning the Control Unit Power Switch ON
This section describes how to supply power to the device control unit.
1. Turn the main power switch ON.
X The device is powered on.
2. Wait at least 30 minutes.
Fig.4-7 Main Power Switch
1. Press the [Power] key .
X The device control unit is powered on.
Fig.4-8 [Main Menu] Screen