EasyManua.ls Logo

ISHIDA CCW-R-2 B Series - Turning the Device Power Switch on; Turning the Control Unit Power Switch on

ISHIDA CCW-R-2 B Series
492 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 OPERATION PROCEDURES CCW-R-2**
INSTRUCTION MANUAL
4-6
4.4.3 Turning the Device Power Switch ON
Turn the main power switch ON at least 30 minutes before starting the
production in order to get stable weighing results.
This section describes how to supply power to the device.
4.4.4 Turning the Control Unit Power Switch ON
This section describes how to supply power to the device control unit.
1. Turn the main power switch ON.
X The device is powered on.
2. Wait at least 30 minutes.
Fig.4-7 Main Power Switch
1. Press the [Power] key .
X The device control unit is powered on.
Fig.4-8 [Main Menu] Screen
MAIN POWER SWITCH

Table of Contents

Related product manuals