CCW-R-2**B INSTRUCTION MANUAL 12 INSTALLATION
12-17
12.5 Check and Adjustment After Installation
After installing the unit and components, and routing the wiring, check the installation condition.
• When entering the weighing machine to check the installation condition, the
operator must turn OFF and lock the main power switch, and keep the key in
his possession during the work.
Table 12-6 Outline of Check and Adjustment After Installation
Checking the assembly condition ( 12.5.1 Checking Assembly Condition of Each Unit)
↓
Turning the power ON ( 12.5.2 Turning the Power ON)
↓
Checking the installation level ( 12.5.3 Changing the Operation Level)
↓
Zero adjustment ( 12.5.4 Zero Adjustment)
↓
Span adjustment ( 12.5.5 Span Adjustment)
↓
Completing the installation operation

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ISHIDA CCW-R-2 B Series and is the answer not in the manual?

ISHIDA CCW-R-2 B Series Specifications

General IconGeneral
BrandISHIDA
ModelCCW-R-2 B Series
CategoryIndustrial Equipment
LanguageEnglish

Related product manuals