4 OPERATION PROCEDURES CCW-R-2**
ï¼¢
INSTRUCTION MANUAL
4-4
4.4 Production Procedures
This section describes the production procedures.
4.4.1 Pre-start Inspection
• For maintenance and inspections, unless instructed, the operator must turn
OFF and lock the main power switch, and keep the key in his possession
during the work.
( 1.6 Power Supply Shut Off and Indication)
• If any part of the device is not securely installed, it may fall due to the vibration
during the production and may damage the device or injure personnel.
• If any problem is found during the pre-start inspection, contact the
maintenance engineer and do not start the operation until the problem is
solved.
Perform the following pre-start inspection before starting the production to eliminate any cause of the
trouble.
1. Make sure that tools and any other irrelevant
objects are not placed on top or in the vicinity
of the device.
2. Make sure that the dispersion table is securely
installed with no play.
3. Make sure that the dispersion table does not
make contact with the radial troughs.
Fig.4-2 Dispersion Table Partial View
4. Make sure that the radial troughs do not make
contact with each other.
5. Make sure that the pool hopper, weigh hopper,
booster hopper and timing hopper (optional)
are securely installed with no play.
6. Make sure that the collection chute is securely
installed.
7. Make sure that the timing hopper and the drive
unit are securely connected with the drive shaft.
(Optional)
Fig.4-3 Radial Trough Partial View