CCW-R-2**B INSTRUCTION MANUAL 12 INSTALLATION
12-1
12 INSTALLATION
12.1 Summary
This chapter describes the installation of the device.
The installation and test operation of the device are performed by Ishida service engineers. Before the
installation, check the installation location and prepare the power source.
Additionally follow instructions in this chapter when relocating or moving the device.
• No one other than Ishida service engineers should perform the installation.
• When relocating the device, contact the distributor or Ishida customer
support.
When the installation is not appropriate, accurate weighing may not be
achieved.
<Contents>
• Installation conditions, transportation and lifting, and installation procedures
<Purpose>
To understand the appropriate installation environment, safe transport and relocation of the device, and
secure installation procedures.
<Intended reader>
• Maintenance engineers
• Ishida service engineers