12 INSTALLATION CCW-R-2**B INSTRUCTION MANUAL
12-28
7. Check documents 1. Check mechanical manufacturing
instructions.
— • Verify visually.
2. Check electrical manufacturing
instructions.
— • Verify visually.
3. Check manufacturing requests and
order specifications.
Check main model of branch
number, and specifications.
• Verify visually.
4. Check specifications. — • Verify visually.
5. Check layout diagram. Installation position and
dimensions of remote control
BOX.
(Height, width, discharge
height, etc.)
• Check visually and by actual
measurement.
6. Check attachments and spare parts. Check tool box, weights,
weigher, and attachments.
Table 12-7 Check Items at Installation (Continued)
Item Contents Procedures Criteria