EasyManua.ls Logo

Philips iE33 - Installation; Introduction; Materials and Equipment

Philips iE33
480 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4535 611 98931 iE33 Service Manual Page 104
CSIP Level 1 Installation: Introduction
5 Installation
Introduction
The purpose of the pre-installation on-site evaluation (“pre-site”) is to ensure a trouble-free
installation and to assist the customer in providing an environment that supports reliable perfor-
mance of the ultrasound system. These instructions are intended to guide you through a com-
prehensive inspection that ensures all physical, electrical, and environmental conditions are
appropriate for optimal system operation. The Installation Checklist included at the end of this
section can be used to ensure that all of the installation steps are performed
The steps required to install a system include:
1. Site inspection
2. System uncrating
3. System inspection and installation
4. Power up
5. Establishing Tech Admin accounts
6. Entering network configuration data
Materials and
Equipment
The following tools, test equipment, documentation, and paperwork are required to perform the
procedures in this section.
FSE Tool Kit
Three-prong Test Plug (6005-0564-01)
Oscilloscope (order from FG stores in Bothell)
ONEAC Line Viewer (order from FG stores in Bothell)
DVM (digital volt meter)

Table of Contents

Other manuals for Philips iE33

Related product manuals