4535 611 98931 iE33 Service Manual Page 108
CSIP Level 1 Installation: System Uncrating
- All necessary Internet Protocol (IP) addresses and subnet information
3. Determine the type of network cabling installed.
4. Identify OEM equipment installers and contact them regarding the installation.
5. Check device compatibility before connecting new devices (such as printers or archive
devices) to the network.
System
Uncrating
Crate Inspection
➤ To inspect the shipping crate before unpacking the system
1. Examine the shipping crate for damage caused by rough handling. Look for evidence that the
crate was opened.
2. Verify that the Shockwatch and Tiltwatch indicators on the outside of the carton have not
been activated. If the indicators are red, check the system for further damage.
3. Report any damage or pilferage to the carrier and to the Philips Ultrasound traffic depart-
ment.
CAUTION Before uncrating the system, ensure the area in front of the shipping crate ramp is clear for at
least 9 ft (2.7 m). (The ramp is the front side and is labeled “OPEN THIS END.”)
Uncrating
Procedure
To uncrate the system, refer to “Installation Procedures” on page 142.