4535 611 98931 iE33 Service Manual Page 105
CSIP Level 1 Installation: Site Inspection
• Fluke LAN Tester
• RMI Model 413 Tissue Equivalent Phantom (199-12204-00)
• RMI Model 406 Dual Attenuation Phantom (2100-1610-01)
• Service manuals for the peripheral devices included with the system
• General Service Manual (4720-0219-XX)
• Installation work orders
• Power Line Data sticker (4765-0247-XX)
• Quality Assurance Audit (PM) label (4100-0941-XX) and label overlay (4100-0941-XX)
Site
Inspection
Environmental
Requirements
➤ To determine if the site meets environmental requirements
1. Verify that the system is to be operated in a room that meets the temperature and humidity
requirements listed in Ta ble 5-1 .
2. Verify that air circulation is adequate to allow for system cooling (air movement will not be
impaired by the room size or obstructions such as draperies or linens).
3. Verify that there is limited dust generation. Dust accumulation on the air filters may cause the
system to overheat.