4535 611 989314730-0047-01iE33 Service Manual Page 155
CSIP Level 1 Installation: Installation Procedures
Figure 5-16 Rolling the System off the Pallet
15. Carefully roll the system off of the
pallet.
16. Dispose of the crate and packing
materials properly.
NOTES
Return the shipping strap brackets
and allenhead screws to manufactur-
ing for re-use, Figure 5-36.
Do NOT return the crate or packing
materials to Philips.
Estimated time to uncrate the sys-
tem is 10 minutes.
This completes the uncrating procedure.
Return to Installation Procedure List.