Ch 6 page 27
ELECTRICAL SYSTEM
SHOP MANUAL
Product final inspection
The following controls are performed on each unit before leaving SNDC.
1)HEATER CONTROL
• Tightness test
• Water valve operation (opening/closing)
2)AIR CONDITIONING CONTROL
• Tightness test
• Thermostat connection
3)ELECTRICAL FUNCTIONS
• Control panel backlight
• Control panel display
• Fresh air door operation (opening/closing)
• Amperage when blower is operating at full speed
• Outside temperature measurement
• Inside temperature measurement
• Electrical continuity
• Low and high pressure switches connexion