SHOP MANUAL
DRIVE LINE
Ch 3 page 156 Ch 3 page 157
DRIVE LINE
Finaly check on the movement, by hand check about the ring can
be moving springy, approx 2 mm by hand.
Protect bearing and connection surfaces before the next step.
Assemble the WDB rear hub
Clean surfaces and assemble the outer bearing cup
Figure 469
Figure 468