EasyManua.ls Logo

Avaya Definity SI - Page 1420

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Object Repair Procedures
555-233-123
10-634 Issue 4 May 2002
1302 FAIL Attempting to use the 120A1 CSU Module with a TN767E circuit
pack that is configured for 32-channel (2.048 Mbps) operation.
The CSU Module only works with a DS1 board configured for
24-channel (1.544 Mbps) operation in the United States of
America.
1. If the 120A1 CSU Module is to be used, physically remove
the TN767E circuit pack and reconfigure for 24-channel
(1.544 Mbps) operation.
2. Reinsert the circuit pack and run the test again.
1303 FAIL The DS1 circuit pack Suffix is incorrect for CSU Module/T1 Sync
Splitter administration. The Near-End CSU Type field on the add
ds1 form has been administered as integrated but the DS1 circuit
pack is not a TN767E or later suffix DS1 board.
1. If the CSU Module or the T1 Sync Splitter is to be used, and
the Near-End CSU Type field is set to integrated to allow for
CSU Module/T1 Sync Splitter administration, remove the
circuit pack and replace it with a TN767E or later suffix board.
Otherwise use the change ds1 command to change the
Near-End CSU Type field to other.
1310 FAIL The DS1 Board Loopback (BLB) demand test (#1209) failed.
1. Repeat the test using the test ds1-loop UUCSS
ds1/csu-loopback-tests command.
2. If the BLB test continues to fail, then replace the TN767E
circuit pack.
3. Run this test again.
Table 10-235. TEST #138 Loss of Signal Alarm Inquiry Test Continued
Error
Code
Tes t
Result Description/Recommendation
Continued on next page

Table of Contents

Related product manuals