Maintenance Object Repair Procedures
555-233-123
10-948 Issue 4 May 2002
1144 ABORT The Packet Bus in the PPN is out of service.
1. Follow the repair procedures for the Packet Bus.
2. Enter test port PCSSpp long and check the results of
this test (939).
2012
2100
ABORT
ABORT
Internal system error
Could not allocate the necessary system resources to run this
test
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL The Loopback test has failed.
1. If this test fails repeatedly wait until all of the ports on the
board are idle (not in use) and reset the circuit pack. To
reset the circuit pack enter the commands busyout board
PCSS and reset PCSS.
2. Repeat the test, and if the test continues to fail replace the
circuit pack.
PASS 1. Connectivity of the D-channel over the Packet Bus is
operational.
Table 10-347. TEST #939 Signaling Port Packet Bus Loopback — Continued
Error
Code
Te s t
Result Description/Recommendation
Continued on next page