EasyManua.ls Logo

Avaya Definity SI - Page 1999

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PE-BCHL (PRI Endpoint Port)
Issue 4 May 2002
10-1213555-233-123
System Technician-Demanded Tests: Descriptions
and Error Codes
Always investigate tests in the order presented in the table below when inspecting
errors in the system. By clearing error codes associated with the NPE Crosstalk
Test, for example, you may also clear errors generated from other tests in the
testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this ports NPE channel talks on the selected
time slot and that it never crosses over to time slots that are reserved for other
connections. If the NPE is not working correctly, one-way and noisy connections
may be observed. This test is usually only part of a ports long test sequence, and
takes about 20 to 30 seconds to complete.
Table 10-451. System Technician-Demanded Tests: DS1-BD
Order of Investigation Short Test Sequence Long Test Sequence D/ND
1
1 D = Destructive, ND = Non-destructive
NPE Crosstalk Test (#6) X ND
Conference Circuit Test (#7) X ND
Audit and Update Test (#36) X X ND
Signaling Link State Check Test (#255) X X ND
Service State Audit Test (#256) X X ND
Call State Audit Test (#257) X X ND

Table of Contents

Related product manuals