Maintenance Commands and Trouble-Clearing Aids
555-233-123
8-8 Issue 4 May 2002
Feature Interactions
Maintenance of a component on a link sometimes interferes with the maintenance
of the link itself. For example, maintenance can put a link component in a busy
state causing link set-up to fail. Frequent attempts at re-setup of a link may delay
the recovery of a faulty component, due to the maintenance test only taking place
when the component is idle. Disable the attempted re-setup of a link with busyout
and the link remains intact. If the link is already down, busyout stops periodic
re-setup attempts on the link.
Output
The following shows the output for busyout journal-printer wakeup-log.
Field descriptions
Action/
Object Qualifier Qualifier Description Logins Default
Feature
Interactions
busyout
journal-
printer
pms-log
wakeup-log
Link to pms (in output, port
name for pms link =1)
Link to the wakeup logging
facility (in output, port name =
0)
Examples:
busyout journal-printer
pms-log
busyout journal-printer
wakeup-log
init
inads
craft
nms
None See below
Port
Physical object port address: 0 = wakeup log, 1 = pms log
Maintenance Name
The name of the maintenance object
Alt. Name
Not applicable
Result
Test result: Pass, Abort, Fail
Error Code
Numeric code explaining why the release failed or aborted.
Refer to the list of the codes by test number for each MO.
busyout journal-printer wakeup-log SPE A
COMMAND RESULTS
Port Maintenance Name Alt. Name Result Error Code
0 JRNL-LINK PASS