EasyManua.ls Logo

Avaya Definity SI - Page 2704

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Object Repair Procedures
555-233-123
10-1918 Issue 4 May 2002
2 FAIL The CLJ-LB test failed because it was not set up properly. The
UDS1 interface pack could not successfully put the CPE
loopback jack into loopback mode.
1. Rerun the test ds1-loop UUCSS
cpe-loopback-jack-test-begin command.
2. If the test continues to fail, the problem could be with the
UDS1-BD board, the CPE loopback jack equipment, or
somewhere between. Run the test ds1-loop UUCSS
ds1/csu-loopback-tests command to determine if the
loopback tests that are closer to the UDS1-BD board are
successful. If any of these tests fail, follow the maintenance
strategy that is associated with the test that fails.
3 FAIL The CPE Loopback Jack Test was not set up properly. The
framed 3-in-24 test pattern, generated by the UDS1 Interface
circuit pack and looped back through the CPE Loopback Jack,
could not be detected properly by the UDS1 circuit pack.
1. Retry the test ds1-loop UUCSS
cpe-loopback-jack-test-begin command.
2. If the CPE Loopback Jack test continues to fail, the problem
could be with the UDS1-BD board, the CPE Loopback Jack
equipment, or somewhere in between. Run the test
ds1-loop UUCSS ds1/csu-loopback-tests command to
see if the loopback tests closer to the UDS1-BD board are
successful. If any of those loopback tests fail, follow the
maintenance strategy associated with those loopbacks.
Table 10-685. TEST #1212 CPE Loopback Jack Test Continued
Error
Code
Te s t
Result Description/Recommendation
Continued on next page

Table of Contents

Related product manuals