EasyManua.ls Logo

Avaya Definity SI - Page 703

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
test journal-printer
Issue 4 May 2002
8-453555-233-123
Feature Interactions
The maintenance of a particular component on a link sometimes interferes with
the maintenance of the link itself. Maintenance can put a link component in a busy
state causing link set-up to fail. Frequent attempts at re-setup of a link may delay
the recovery of a faulty component due to the maintenance test of a component
only taking place when the component is idle. Therefore, the technician needs to
be able to disable the attempted re-setup of a link. Use of the busyout command
causes the link to be torn down. If the link is already down, the busyout command
stops periodic re-setup trys on the link.
Output
The following example shows the output for the test journal-printer pms-log
command. The responses display on a test-by-test basis with one line of data for
each test result.
Field descriptions
Port
Not applicable (always blank)
Maintenance
Name
The name of maintenance object being tested:
PMS-PRINT for testing the pms-log printer link
JNL-PRNT for testing the wakeup-log printer link
Alt. Name
Not applicable (always blank)
Test No
The test being executed
Result
Test result: Pass, Abort, Fail, Disabled
Error Code
Numeric code explaining why the release failed or aborted.
Refer to the detailed list of codes by test number for each MO.
test journal-printer pms-log short
TEST RESULTS
Port Maintenance Name Alt. Name Test No. Result Error Code
JRNL-LINK 215 PASS
Command Successfully Completed

Table of Contents

Related product manuals