EasyManua.ls Logo

Doosan DA40 - Page 360

Doosan DA40
945 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SHOP MANUAL
TRANSMISSION
Ch 2 page 60 Ch 2 page 61
TRANSMISSION
Assemble the protecion cover to original porsition.
Assemble the “IN” A/C hose (large fitting), “OUT” A/C hose (small fitting),
reconnect the 6 connectors from left to right (S1, S2, S3, S4, S5, S6)
Assemble the driver cabin and put the LH and RH pins to the cabin hinge with snap rings.
Make sure the snap ring is placed in the pin groove.
Figure 148Figure 147
Figure 150
Figure 149
Figure 151

Table of Contents