CHAPTER65 Testing SIP Signaling Calls
Mediant 1000 Gateway & E-SBC | User's Manual
● Dial: Starts the test call (applicable only if the test call party is the caller).
● Drop Call: Stops the test call.
● Restart: Ends all established calls and then starts the test call session again.
Viewing Test Call Status
You can view the status of test call rules in the 'Test Status' field of the Test Call Rules table. The
status can be one of the following:
Table 65-2: Test Call Status Description
Status Description
"Idle" Test call is not active.
"Scheduled" Test call is planned to run (according to the 'Schedule Interval' parameter).
"Running" Test call has been started (i.e., by clicking Dial from the 'Action' drop-down
list).
"Receiving": Test call has been automatically activated by calls received from the remote
endpoint for the test call endpoint (when all these calls end, the status returns
to "Idle").
"Terminating" Test call is in the process of terminating currently established calls (when
Drop Call is clicked from the 'Action' drop-down list to stop the test).
"Done" Test call has successfully completed (or was prematurely stopped by clicking
the Drop Call from the 'Action' drop-down list).
Viewing Test Call Statistics
You can view statistical information on the test call.
● On the receiving side, when the first call is accepted in "Idle" state, statistics are
reset.
● The device also generates CDRs for test calls if you have enabled CDR generation
(see Configuring CDR Reporting). To view CDRs of test calls, see Viewing
Gateway CDR History on page957.
➢ To view statistics of a test call:
1. In the Test Call Rules table, select the required test call row.
2. Scroll down the page to the area below the table. Statistics of the selected test call are
displayed under the Statistics group, as shown in the example below: