Maintenance Object Repair Procedures
555-233-123
10-1000 Issue 4 May 2002
1019 ABORT Another Test call is in progress.
1. Issue list isdn-testcall to locate the test call.
2. Issue status isdn-testcall to find out the duration and
start time of the test call.
3. Issue clear isdn-testcall to stop the test call from running.
1020 ABORT There is a problem with DS1 Interface Circuit Pack.
1. Refer to the DS1-BD (DS1 Trunk circuit pack).
1024 ABORT Maintenance/Test Digital Port in use.
1. Wait until yellow and green LEDs are turned off on the
Maintenance/Test circuit pack.
2. Retry the test.
1113 ABORT The signaling link has failed. Therefore, the system cannot
send any messages on behalf of this trunk.
1. Check the results of Test #255 (Signaling Link State
Check Test).
1114 ABORT The signaling link is in a transitional state.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1116 ABORT The switch could not appropriately change the ISDN service
state.
1. Determine if a call is active on this DS1 ISDN Trunk (use
status trunk).
2. If not, check the Error and Alarm Logs for problems with
this ISDN-TRK (DS1 ISDN Trunk) MO.
1117 ABORT ISDN B-channel maintenance message is already
outstanding.
1. Wait two minutes. Then try again.
1118 ABORT Far-end of ISDN trunk is not administered.
1. Check the administration of the far-end ISDN trunk.
2. Issue status trunk.
3. Try the test again.
Table 10-363. TEST #258 ISDN TEST Call — Continued
Error
Code
Te s t
Result Description/Recommendation
Continued on next page