Maintenance Object Repair Procedures
555-233-123
10-1176 Issue 4 May 2002
Audit and Update Test (#36)
This test sends port level translation data from switch processor to the DS1
Interface circuit pack to assure that the trunk’s translation is correct. Translation
updates include the following data: trunk type (in/out), dial type, timing
parameters, and signaling bits enabled. The port audit operation verifies the
consistency of the current state of the trunk as kept in the DS1 Interface circuit
pack and in the switch software.
Table 10-443. TEST #36 Audit and Update Test
Error
Code
Tes t
Result Description/Recommendation
ABORT Internal System Error.
1. Retry the command at one-minute intervals a
maximum of 5 times.
1000 ABORT The test was aborted because system resources required
to run this test were not available. The port may be busy
with a valid call. Use the display port PCSSpp command
to determine the station extension of the port. Use the
status station command to determine the service state of
the port. If the service state indicates that the port is in use,
then the port is unavailable for certain tests. You must wait
until the port is idle before retesting.
1. If the port is idle, retry the command at 1-minute
intervals a maximum of 5 times.
1006 ABORT The test was aborted because the station is out of service.
This condition may be accompanied by an error type 18
entry in the error log. You may want to determine why the
station was taken out of service. (When stations are taken
out of service by maintenance software, the problems that
preceded that point must be cleared.)
1. Use the status station command to check the service
state of the port. If the port is indeed out of service,
enter the release station command to bring the
station back into service.
2. Retry the command at 1-minute intervals a maximum
of 5 times.
3. If the test continues to abort and the service state
indicates that the station is in service and idle, escalate
the problem.
Continued on next page