EasyManua.ls Logo

Avaya Definity SI - Page 2003

Avaya Definity SI
2968 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PE-BCHL (PRI Endpoint Port)
Issue 4 May 2002
10-1217555-233-123
Audit and Update Test (#36)
This test sends port level translation data from the switch processor to the UDS1
interface circuit pack to ensure that the ports translation is correct. The port audit
operation verifies the consistency of the current state of the port that is kept in the
UDS1 interface circuit pack and in the switch software.
Table 10-454. TEST #36 Audit and Update Test
Error
Code
Te s t
Result Description/Recommendation
ABORT Internal system error
2000 ABORT Response to the test request was not received within the
allowable time period.
2100 ABORT Could not allocate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals a maximum of 5
times.
FAIL The test failed due to Internal system error.
1. Retry the command at 1-minute intervals a maximum of 5
times.
PASS The port translation has been updated successfully. The
current port states kept in the UDS1 interface circuit pack and
in the switch software are consistent. If the port is busied out,
the test does not run, but returns PASS. To verify that the port
is in-service:
1. Enter status pri-endpoint <extension> to verify that the
port is in-service. If the port is in-service, no further action
is necessary. If the port is out-of-service, go to Step 2.
2. Enter the release pri-endpoint <extension> command
or the release port <PCSSpp> command to put the port
back into in-service.
3. Retry the test command.
Continued on next page

Table of Contents