EasyManua.ls Logo

Avaya Definity SI - Page 2149

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PPP-PT (Control LAN Packet/Port)
Issue 4 May 2002
10-1363555-233-123
1 FAIL System software indicates at least one PPP link session is
down (SOME UP).
1. Isolate downed sessions (status port UUCSSpp or status
link n).
Follow actions based on session information.
2 FAIL System software indicates all PPP sessions are down (ALL
DOWN).
1. Test the port (test port UUCSSpp) to verify the SCOTCH
Synchronous Looparound Test (#1275) result.
2. If test passes, wait for system software to indicate ALL UP.
3. If the test fails, check the destination and other components
in the path.
4. If the destination and other components in the path are
in-service, take action based on session information.
PASS All sessions up.
Table 10-503. TEST #1286 Session Status Test Continued
Error
Code
Tes t
Result Description/Recommendation
Continued on next page

Table of Contents

Related product manuals