Maintenance Object Repair Procedures
555-233-123
10-1364 Issue 4 May 2002
PPP Link Status Inquiry Test (#1279)
This non-destructive test determines the state of the PPP link. The test passes
only if the link is up.
Table 10-504. TEST #1279 PPP Link Status Inquiry Test
Error
Code
Tes t
Result Description/Recommendation
1124 ABORT ppp link is not enabled.
1. Verify that the ppp link is enabled (status port UUCSSpp,
status link n, or display data-module).
2. If the link is not enabled, enable the link (change
data-module).
3. Repeat the test.
4. Escalate if the problem persists.
1125 ABORT PPP Link is not in service.
1. Verify whether PPP link is in-service (status port
UUCSSpp or status link n).
2. If the PPP link is not in service, release the link (release
link n or release port UUCSSpp).
3. Repeat the test.
4. Escalate if the problem persists.
2100 ABORT Could not locate the necessary system resources to run this
test.
1. Retry the command at 1-minute intervals, up to 5 times.
2. Escalate if the problem persists.
2500 ABORT Internal system error.
1. Retry the command at 1-minute intervals, up to 3 times.
2. Escalate if the problem persists.
Continued on next page