EasyManua.ls Logo

Avaya Definity SI - Page 2200

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Object Repair Procedures
555-233-123
10-1414 Issue 4 May 2002
Link Tear Down Test (#213)
This test is destructive.
This test disconnects the existing link between the system and the external CDR
output device. If the link has been disconnected already, this test just returns
PASS. All resources allocated for an CDR link are released after this test.
Table 10-529. TEST #213 Link Tear Down Test
Error
Code
Tes t
Result Description/Recommendation
40 ABORT Internal system error
50 ABORT Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
1010 ABORT The CDR link has been busied out to out-of-service.
1. Enter the release cdr-link primary|secondary command to
release the CDR link from busyout state.
2. Retry the test cdr-link primary|secondary long command to
execute the test.
FAIL Internal system error
1. Retry the command at 1-minute intervals a maximum of 5
times.
PASS The CDR link is torn down.
Continued on next page

Table of Contents

Related product manuals