Maintenance Object Repair Procedures
555-233-123
10-1682 Issue 4 May 2002
3 FAIL Received a status of Level 1 Deactivated; the port is
out-of-service.
1. Issue the status bri-port PCSSpp command to verify
that the service state of the port is out-of-service. If the
service state of the port is not out-of-service, escalate the
problem to the next tier. Otherwise, proceed to Step 2.
2. If the port has been placed out-of-service with the
busyout port PCSSpp command, try releasing the port
by executing the release port PCSSpp command. Then
issue the test port long PCSSpp command and review
the results of Level 1 Status Inquiry test. If this test still
fails, proceed to Step 3.
3. After executing the test port long PCSSpp command,
review the results of all the tests. Follow the repair
procedures for any tests that fail. Verify repair of the
problem by executing the test port PCSSpp command
and by determining that the Level 1 Status test passes. If
the test continues to fail for this reason, escalate the
problem to the next tier.
4 FAIL Received a status of Level 1 Pending Activation, the NT1 has
a loss of power indicating a problem with the NT1.
1. Follow the manufacturer-recommended repair
procedures for the NT1.
2. Execute the test port PCSSpp command and review the
results of the Level 1 Status Inquiry test to verify the
repair.
PASS This test indicates that Level 1 is activated or that software
has taken the port out of service.
Table 10-618. TEST #1242 Level 1 Status Inquiry — Continued
Error
Code
Te s t
Result Description/Recommendation
Continued on next page