TBRI-TRK (TN2185 ISDN Trunk-Side BRI)
Issue 4 May 2002
10-1693 555-233-123
Asynchronous Commands
NOTE:
Only one trunk can be tested in a given port network, until the test call is
canceled or completes.
Table 10-624. TEST #258 ISDN TEST Call
Error
Code
Te s t
Result Description/Recommendation
4 ABORT There is a problem with the Processor Interface Link.
1. Refer to the PI-LINK (Processor Interface Link)
Maintenance documentation.
1004 ABORT B channel in use.
1. Determine if a call is active on this ISDN Trunk-side BRI
trunk via the status trunk command.
2. When the service state indicates in-service/idle, retry the
test.
1005 ABORT Bad Configuration (that is, no Maintenance/Test circuit pack)
Issue the test trunk <trunk Group/trunk member>
command and make sure there is a DATA-CHL (NETCON
channel) administered.
1018 ABORT Test call is disabled.
1. Enable Maintenance on the Trunk Group form.
1024 ABORT (M/T-DIG) Maintenance/Test Digital Port in use.
1. Wait until yellow and green LEDs are turned off on the
M/T-BD (Maintenance/Test circuit pack).
2. Retry the test. If problem persists, refer to M/T-DIG
(Maintenance/Test Digital Port) documentation.
1113 ABORT The signaling link has failed; the system cannot send any
messages on behalf of this trunk.
1. Check the results of Test #1251 (Signaling Link State
Check Test).
1114 ABORT The signaling link is in a transitional state.
1. Retry the command at 1-minute intervals a maximum of 5
times.
Continued on next page