EasyManua.ls Logo

Avaya Definity SI - Page 2768

Avaya Definity SI
2968 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Object Repair Procedures
555-233-123
10-1982 Issue 4 May 2002
VC Port Reset DSP Test (#1106)
This test is destructive.
This test resets the VC-DSPPT and the DSP associated with it. As part of the
reset procedure, the VC-DSPPT will execute a series of self- tests on the
hardware. If these self- tests fail, the test will fail; otherwise the test will pass.
Before executing the test, the VC-DSPPT must be busied out by executing the
busy port PCSSpp command. After the completion of the test, the VC-DSPPT
must be released by executing the release port PCSSpp command.
2100 ABORT Could not allocate the necessary system resources to run this
test.
1. Rerun the test at 1-minute intervals a maximum of 5 times.
0, 1 FAIL The VC-DSPPT DSP Loopback Test failed.
1. Replace the circuit pack.
PASS The VC DSPPT DSP Loopback Test passed
Table 10-712. TEST #1106 VC Port Reset DSP Test
Error
Code
Te s t
Result Description/Recommendation
1000 ABORT System resources required to run this test are not available, or the
port may be busy with a call.
1. Retry the command at 1-minute intervals a maximum of 5
times.
1015 ABORT The VC-DSPPT is not busied out.
1. Busy out the VC-DSPPT by executing the busy port PCSSpp
command and then retry the test.
2000 ABORT Response to the test was not received from the VC-DSPPT within
the allowable time period.
1. Retry the command at 1-minute intervals a maximum of 5
times.
2. If this result occurs again, replace the circuit pack.
Continued on next page
Table 10-711. TEST #1105 VC-DSP Port DSP Loopback Test Continued
Error
Code
Te s t
Result Description/Recommendation
Continued on next page

Table of Contents

Related product manuals