status bri-port
Issue 4 May 2002
8-313555-233-123
Status Interpretation
The following table provides information on the status bri-port form.
Table 8-10. Status BRI-Port Command Interpretation
Endpoint
Types
TEI
Range Layer 2 State
Voi c e
Extension
Service
SPID Description /Recommendation
ASAI,
BRI
0-126 Assigned blank blank Transitory state for BRI endpoints
and ASAI adjuncts. The switch
attempts link establishment.
1. Check endpoints and wiring by
following SPID Facility Test
Procedures described in the
BRI-SET (ISDN-BRI Set/ASAI
Adjunct) Maintenance
documentation.
2. Verify repairs by executing the
status bri-port PCSSpp
command. Determine that L2
state of the signaling link is
“L3-Established” for ASAI
adjuncts and BRI endpoints
supporting MIM (management
information messages)
initialization, and “Established”
for fixed TEIBRI endpoints and
automatic TEIBRI endpoints not
supporting MIM initialization.
NOTE:
A MIM is a level-3 message
that conveys management
and maintenance information
between communications
systems and BRI terminals.
Continued on next page