378 Upgrade and Maintenance Manual RX2540 M4
Ê Connect the two control cables from the LC device to the system board, see
figure 242 on page 364:
– Pump 1 to connector "LC1"
– Pump 2 to connector "LC2"
Ê Install the crossbar, see figure 404 on page 538.
Figure 260: Routing the tubes
Ê Run the tubes as shown.