REMOVAL AND INSTALLATION (CONTINUED)
E6582 EN 06/2001 2002 Bantam
Installation
1. Refit the Load Active Valve (LAV) link rod and
bush to the axle tube. Wipe the link rod
clean and re-grease and align the rod with
its spacer tube.
2. Secure the axle tube to the springs with the
"U" bolts and nuts.
3. Refit the carrier plate assembly with two new
rivets.
4. Refit the brake drum and hub assembly.
Torque specification for retaining bolts
(four off) 66 Nm
5. Repeat steps 3 to 4 for the remaining side.
6. Lower the vehicle to the ground and finally
tighten all nuts and bolts to the specified
to
rque. Refer to Section 204-02-17
7. Adjust Load apportioning valve (LAV). For
addit
ional information, refer to Section 206-00
204-02-9 Rear Suspension 204-02-9