303-01B-126 Engine — 1.6L / 1.3L RoCam 303-01B-126
INSTALLATION (CONTINUED)
E6646 EN 07/2001 2002 Bantam
44. Install the battery tray.
1. Install new cable ties.
2. Install the bolts.
45. Check the engine oil level. If necessary, fill
the engine with low friction oil meeting
specification SAE 15W 40 or SAE 10W 30
46. Install the battery. For additional
information, refer to Section 414-01.
47. Fill the cooling system. For additional
infor
mation, refer to Section 303-03.
48. Adjust the gearshift linkage. For additional
information, refer to Section 308-06.
49. Bleed the clutch system. For additional
infor
mation, refer to Section 308-00.