Material setup 9 Field-IQ system setup
Operation tab
Setting Explanation
Jump Start Speed The speed to be used when the master switch on the Field-IQ
system master switch box is put in the jump start position.
This manual override option can be used to operate the
system when the vehicle is stationary. Jump start is also used
when GPS has become unavailable.
Jump Start Timeout Time that jumpstart speed will be active. A timeout setting for
the jumpstart speed, which allows you to run the jump start
for a specified amount of time.
Auto control resumes if jumpstart speed is exceeded by
Ground Speed.
Shutoff Speed This setting will shut the control system down when the
vehicle reaches a minimum speed.
Minimum Override Speed Setting used to hold the operating speed at a preset minimum
to prevent the control system from operating out of a
controllable range. Maintains the application rate when the
implement's actual speed drops below the value entered. It is
used to ensure consistent material flow during slow speeds.
Apply Latency to Boundary
Note –
Only applies to fields that
have a boundary.
This setting is also applied when you exit an exclusion zone and
return to the workable area of the field.
l Yes: The system starts when needed to begin applying
immediately when crossing a boundary.
l No: The system starts when the boundary is reached and
any mechanical delay could leave a gap between the
boundary and where the product is applied. When GPS
accuracy is low, this is the preferred selection.
Rate Snapping Due to pump constraints, liquid flow generally is inconsistent
with the information on the display. Enabling this setting gives
you a more steady reading of the applied rate. If you are with
in the allowable error, you will see the applied rate just show
your target rate.
212 FM-1000 Integrated Display User Guide Version 9.25, Revision B