Control setup 9 Field-IQ system setup
l The secondary material is not functional.
l You can only operate a linked material when you also open the sections of the primary
material.
1.
To link materials, at the Section Control tab, complete these settings.
Setting Explanation
Section Control Select
Link to Material
.
Linked Material Select the primary material you want to link to.
2. Select the Rate Control tab and then set up rate control.
For more information, see the sections for each type below.
Automatic SectionControl
The Field-IQ system can perform automatic section control using:
l Air clutch (such as Tru Count Air Clutch)or electric clutch: Used for TC and John Deere row
command clutches that require inverted switching. (Signal to shut row off)
l Boom valves:Used for 3 wire boom valves and 2 wire solenoid valves that require a 12v signal
to open.
l LiquiBlock valves (such as Tru Count LiquiBlock valves):Used for Liquiblock valves that require
inverted switching.
l Various section control devices
1. At the Field-IQSetup screen on the Section Control tab, for:
a. Section Control: Select On.
b. Section Control Module Location: Tap Setup. The Section Control Module Setup screen displays.
2. Complete the settings for:
ll Number of Modules: The total number of modules that will be used on the current control
location.
l
Module: Assign the serial numbers of the modules to their location on the current control
location.
Note – Sections start from left to right in their numbering. This means that Section 1 is on the far
left and numbers increase to the right.
l Number of Sections: The number of sections physically wired into the selected module serial
number.
3. If you have a row crop, tap Section Grouping. Otherwise tap Section Widths.
220 FM-1000 Integrated Display User Guide Version 9.25, Revision B