11 ISOBUS setup Task Controller setup
Task Controller setup
Make sure you have:
l Connected the CAN bus to the display
l Unlocked the ISOBUS Task Controller functionality
l Activated Task Controller
1.
On the Home screen, tap . The Configuration screen displays.
2.
At the Configuration screen, select Task Controller and then tap Setup.
3.
At the Task Control Setup screen in the Rates tab, enter the settings.
Setting Explanation
Target Rate 1 The first target rate for the volume supplied by the
implement
Target Rate 2 The second target rate for the volume supplied by the
implement
Rate Increment When you increment / decrement Rate 1 or Rate 2 on the Run
screen, the current application rate increases or decreases
by this amount.
Minimum Rate Minimum rate to be applied
Maximum Rate Maximum rate to be applied
4. In the Boom tab, enter the Valve On Latency and Valve Off Latency. These values are the measured
times that it takes the implement to start coverage after the command is given.
5. Tap OK to return to the Configuration screen.
6. Tap OK to return to the Home screen.
For operational information, see Task Controller operation (page 412).
Version 9.25, Revision B FM-1000 Integrated Display User Guide 251