412-00-13 Climate Control System — General Information 412-00-13
DIAGNOSIS AND TESTING (CONTINUED)
CONDITIONS
DETAILS/RESULTS/ACTIONS
6 Measure the voltage between A/C compressor
clutch, connector C75, pin 1, circuit 14S-CA6
(VT/YE), harness side and ground.
• Is battery voltage indicated?
Yes
GO TO B9
No
REPAIR the open circuit(s) between relay –
A/C W.O.T and A/C compressor clutch by
using the wiring diagrams. TEST the system
for normal operation.
B9: CHECK THE GROUND SUPPLY OF THE A/C COMPRESSOR CLUTCH
1.
2 Measure the resistance between A/C
compressor clutch, connector C75, pin 2,
circuit 31-CA6 (BK), harness side and ground.
• Is the resistance less than 2 ohms?
Yes
CHECK the A/C compressor clutch, if
necessary INSTALL a new one. TEST the
system for normal operation.
No
REPAIR the open circuit(s) between A/C
compressor clutch and ground G9 by using
the wiring diagrams. TEST the system for
normal operation.
B10: CHECK THE RELAY – A/C WOT
1 Check the relay – A/C W.O.T referring to the
Component Test.
• Is the relay OK?
Yes
GO TO B11
No
INSTALL a new relay – A/C W.O.T. TEST
the system for normal operation.
E9425 EN 07/2001 2002 Bantam