RX2540 M2 Upgrade and Maintenance Manual 373
Figure 259: Closing socket release lever 1
Ê Close the socket release lever 1 (1) and latch it under the load plate
retention tab (2).
Ê If applicable, install the second CPU accordingly.
10.2.3 Concluding steps
Ê "Installing CPU heat sinks" on page 383
Ê "Reassembling" on page 73
Ê "Connecting the power cord" on page 79
Ê "Updating or recovering the system board BIOS and iRMC" on page 103
Ê "Switching on the server" on page 82
Ê "Enabling SVOM boot watchdog functionality" on page 114
Ê "Resuming BitLocker functionality" on page 120