426 Upgrade and Maintenance Manual RX2540 M2
12.3.3.4 Concluding steps
Ê "Installing the front panel cage" on page 485
Ê "Installing the fan box" on page 399
Ê "Reassembling" on page 73
Ê "Connecting the power cord" on page 79
Ê "Resuming BitLocker functionality" on page 120
12.4 LTO drive
12.4.1 Installing the LTO drive
12.4.1.1 Preliminary steps
Ê "Suspending BitLocker functionality" on page 95
Ê "Shutting down the server" on page 65
Ê "Disconnecting the power cord" on page 66
Ê "Getting access to the component" on page 68
Ê "Removing the fan box" on page 397
Ê "Installing the front panel cage" on page 485
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver