410 Upgrade and Maintenance Manual RX2540 M2
12.2.2 Removing the ODD
12.2.2.1 Preliminary steps
Ê Ask the system administrator to eject all remaining backup or optical media
from the backup or ODD before removing it from the server.
Ê "Suspending BitLocker functionality" on page 95
Ê "Shutting down the server" on page 65
Ê "Disconnecting the power cord" on page 66
Ê "Getting access to the component" on page 68
Ê "Removing the fan box" on page 397
Ê "Removing the front panel module" on page 455
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools: Phillips PZ2 / (+) No. 2 screw driver / nut driver 5 mm