466 Upgrade and Maintenance Manual RX2540 M2
Front panel and external front connectors
13.3 Front VGA connector 3.5-inch versions
13.3.1 Installing the front VGA connector
13.3.1.1 Preliminary steps
Ê "Suspending BitLocker functionality" on page 95
Ê "Locating the defective server" on page 61
Ê "Shutting down the server" on page 65
Ê "Disconnecting the power cord" on page 66
Ê "Getting access to the component" on page 68
Ê "Removing the fan box" on page 397
13.3.1.2 Removing the front panel module
Ê "Removing the front panel module" on page 455
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools: flat screw driver
Phillips PH1 / (+) No. 1 screw driver